Management of Change (MOC) is a structured process for identifying, assessing, and controlling risks introduced by changes to operations, organization, equipment, or procedures. MOC is required by 14 CFR 5.51, which mandates that Safety Risk Management be applied whenever changes are made to existing systems. PlaneConnection’s MOC workflow ensures that no change is implemented without an appropriate level of safety review.

MOC Statuses

Status Lifecycle

Status Transition Rules

Change Categories

8-Question Screening Checklist

The screening checklist determines whether a proposed change requires a formal risk assessment. If any question is answered “Yes,” the MOC advances to Risk Assessment. If all are answered “No,” the MOC may be closed with documented rationale.
Covers direct and indirect effects on flight operations, airspace, or aircraft performance.
Covers conditions that could foreseeably cause or contribute to an aircraft accident.
Covers weakening, removal, or bypassing of current safety defenses.
Covers new skills, certifications, or training required to operate safely under the change.
Covers aircraft systems, maintenance tooling, dispatch systems, or safety-critical software.
Covers operating procedures that must be revised to reflect the change.
Covers ATC coordination, vendor relationships, interline agreements, or data system integrations.
Covers second-order effects — a change in one area may create risks elsewhere.

Emergency vs. Standard Timelines

Some changes cannot wait for the full MOC process. PlaneConnection supports two timeline modes. Emergency MOC safeguards: An emergency MOC that is not completed (full review and closure) within 30 days is automatically escalated to the accountable executive.

MOC Fields

Post-Review

The post-review (PIR) evaluates whether the change was implemented as planned and whether any unanticipated safety effects have emerged. The review covers: If the PIR identifies new hazards or ineffective controls, the MOC is returned to Risk Assessment for additional analysis.

Regulatory Alignment

Manage Change

Initiate and manage an MOC.

Risk Assessment Matrix

Risk matrix used during MOC risk assessment.

CPA Lifecycle

Lifecycle for actions generated from MOC risk assessments.

FAA Part 5 Overview

Regulatory context for Management of Change requirements.