Who should read this: Anyone proposing a change to operations,
equipment, procedures, or organizational structure. Safety managers
review and approve MOC requests. Admins configure MOC workflows.Prerequisites: Any workspace member can submit a change request.
Safety manager or admin role is required to review, approve, or
reject requests.
MOC Workflow Overview
| Status | Description |
|---|---|
| Draft | Change request created. Basic details captured. |
| Screening | Change is being evaluated against the 8-question screening checklist. |
| Risk Assessment | Change has been screened and requires a formal risk assessment. |
| Approval | Risk assessment complete. Change awaiting management approval. |
| Implementation | Change approved and being implemented. |
| Post-Review | Change has been implemented. Effectiveness and safety impact under review. |
| Closed | MOC process complete. Record is immutable. |
Submit a Change Request
In the Safety sidebar, navigate to Management of Change and create a new change request. You can also use
Cmd+K and select “New Change Request.”Choose the category that best describes the change (Operational, Organizational, Technical, Regulatory, or Process). For the full category reference, see MOC Workflow.
Use a clear title that summarizes the proposed change. Include what is changing and why, the current vs. proposed state, affected systems and personnel, and expected timeline.
Select Standard or Emergency. If you need to select Emergency, only do so when delay would create a greater safety risk than proceeding.
Emergency changes bypass the standard screening timeline but still require a complete risk
assessment and post-implementation review.
Complete the MOC Screening
The checklist includes 8 questions evaluating whether the change could affect operations, maintenance, personnel, equipment, compliance, hazards, risk controls, or external interfaces. For the full screening checklist, see MOC Workflow.
If any question is answered Yes, the change requires a full risk assessment. If all answers are No, the change may proceed with documentation only.
Perform the Risk Assessment
If the screening determines a risk assessment is needed:For each identified hazard, rate severity and likelihood using the ICAO 5x5 risk matrix. See Conduct a Risk Assessment for detailed guidance.
For hazards in the yellow (ALARP) or red (Unacceptable) zone, define controls to reduce the risk before the change is implemented.
Approve or Reject the Change
Review the complete MOC package — change description, screening results, risk assessment, and residual risk levels — then make your decision:- If you want to authorize the change, approve it with any conditions or monitoring requirements.
- If you want to reject, document the reasons and return to the requestor.
- If you need more information, request changes before making a decision.
Conduct Post-Review (PIR)
After an approved change has been implemented:Assess whether the change was implemented as planned, risk controls are functioning, no new hazards have emerged, and safety performance has not degraded.
Related
MOC Workflow
Complete reference for MOC statuses, screening questions, and approval rules.
Conduct a Risk Assessment
Detailed guidance on the 5x5 risk matrix used during MOC risk assessment.
Create a CPA
Creating corrective actions from MOC findings.
Track Compliance
How MOC records contribute to Part 5 compliance.